Waste Management Program

Waste Management Program (WMP) defines the waste which is likely to occur during the construction of ITE Natural Gas Pipeline (DGBH) Project and includes the appropriate waste management activities carried out to collect, store, refine and/or eliminate them. WMP involves the waste occurring as a result of construction and relevant activities.

A different WMP should be prepared for the wastes of the plant before performing the project. WMP is a general plan and is designed as a guideline aimed to be used while preparing plans and procedures during application. After the construction stage starts, the draft WMP and area-specific WMP indicating how the requirements of this draft WMP will be carried out and Waste Management Procedures are submitted for the approval. 

 

İstinye Mahallesi, Bostan Sokak No:12
İstinye Sarıyer Istanbul / Turkey
info@baslam.com.tr . http://www.asbgroup.com.tr